Sunday, 6 March 2011

More detailed production schedule (edit: shots assigned)

Hey look at that, more information:


Here's the shot information Eifion sent to me:

shot 01 = 232 (116) [claimed by Farideh]
shot 02 = 61 (~30) [claimed by Nathan]
shot 03 = 52 (26) [claimed by Nathan]
shot 04 = 67 (~33) [claimed by Farideh]
shot 05 = 114 (57) [claimed by James]
shot 06 = 140 (70) [claimed by Alison]
shot 07 = 85 (~42) [claimed by Eifion]
shot 08 = 99 (~49) [claimed by Alison]
shot 09 = 198 (99) [claimed by Eifion]
shot 10 = 173 (~86) [claimed by Grace]
shot 11 = 315 (~157) [claimed by James]

credits = 135 (~67) [claimed by Farideh]
animated logo = claimed by Grace

James and Grace tag-team for backgrounds.

Oh, and for the lucky soul doing shot 11, if you work at the minimum capacity I laid out, it's actually gonna take you about 18 days.

I'll place claims on this post as they're called in.

G

No comments:

Post a Comment